Premiers' Engineering Solutions team are comprised of some of our brightest talent. The group's vision is to take our core services and products, and integrate them with engineering knowledge to deliver a solution of better hydrocarbon production or lower operating costs for our clients.

This model has proven to be extremely successful for clients who are looking for ways to minimize declining production, reduce their operating costs, or operate with minimal staff. Combining best-in-class services and products with a team of experienced engineers has resulted in numerous successful case histories. Please select one of our client's rewarding projects below to learn more.

Please contact our Sales Team
Case History
Below is a short description of each case history, you can view the whole description by clicking on the image
Alberta Gas Well Production Returned To Normal Decline RateGas production from an Albertan gas well severely dropped off.PIT’ Engineering Solutions team evaluated the well and found it to be loading with liquids. PIT installed and optimized the system for maximum production rates.The customer’s incremental production paid for the equipment and installation within 10 days.
Alberta Gas Well's Production Stabilized using a Remote SCADA well head manager Flow line pressure was fluctuating causing the well to load with liquids and production rates to vary.PIT’ Engineering Solutions team evaluated the well and found that the line pressure fluctuated severely due to field compressor problems. PIT installed an Remote SCADA well head manager on this well The production was stabilized at 10 E3M3/day (350 mcfd) with no down-time from the compressor problems.
Alberta Gas Well Production Optimization PIT ’ Engineering Solutions team evaluated the existing plunger lift operating conditions of the well. PIT made systematic changes to the operation of this well including cycling the week with no plunger and then installing the plunger and optimizing cycle times. The original shut-in (or close) time was discovered to be too short.Gas production increased by 80% and the liquid production increased 7%.